Mass change Next Run date for 50 schedule task

BatchPatch Forums Home Forums BatchPatch Support Forum Mass change Next Run date for 50 schedule task

Viewing 3 posts - 1 through 3 (of 3 total)
  • Author
    Posts
  • #8817
    stevenfoo
    Participant

    Hi,

    I wanted to change 50 schedule tasks with only the date change. The time remain the same.

    How could I do that? I have more than eg. 100 tasks.

    Changing 1 by 1 is not productive.

    #10093
    doug
    Moderator

    If you select all 50 rows at once, you can modify them all at once, but they will all end up with the same run date/time, which I understand is probably not what you want. In order for 50 tasks to all have different run times, they cannot be modified at the same time in BP. Your best option is probably to save the grid to .bps file, and then open the .bps file in a text editor like Notepad++ and manually update the run dates.

    -Doug

    #10095
    stevenfoo
    Participant

    Hi Doug,

    Ok I go it. The only way is to manually duplicate a file and change the date only. And then use this new .bps file.

Viewing 3 posts - 1 through 3 (of 3 total)
  • You must be logged in to reply to this topic.